Boggabri Coal Mine

  • ClientBoggabri Coal Mine
  • DateJun 2020
  • Industry SectorsMining

Boggabri Coal Mine is an open-cut coal mine in operation since 2006.

The mine supports a workforce of around 600 employees and contractors. Mined Coal is processed through a coal handling and preparation plant before being transported to the Port of Newcastle for international export.
The mine produces up to 7 million tonnes per annum (mtpa) of saleable coal with a mine life to 2033.

Client Requirement

The customer used a diesel generator to power up the telecommunication loads at a remote mining site. This type of system suffers from several major drawbacks, i.e. cost of fuel and transportation, operation noise, and CO2 emission.

Moreover, running the diesel generators under low-load can result in glazing and carbon build-up. The client sought a reliable solar generator with sufficient battery back-up to replace their existing solution

                   
Related Projects

Case Studies

  • Thanks For Requesting Our Documents

    Please provide us quick details before downloading the document

  • Thanks For Requesting Our Documents

    Please provide us quick details before downloading the document

We’re here to help.

Get in touch