Magellan Power Adds Redundancy Alongside a 19-Year-Old Charger at Fertiglobe Egypt
- ClientFertiglobe
- DateAugust 2026
- Industry SectorsFertiliser / Industrial
- LocationAin Sokhna, Suez, Egypt
Supporting Plant Continuity with a Redundant Charger Configuration
After 19 years of operation, the Magellan Power battery charger installed at Fertiglobe’s Ain Sokhna facility in 2007 remained in service. However, the original configuration did not include charger redundancy.
Magellan Power supplied and commissioned a second charger in parallel with the existing unit, allowing either charger to be isolated for repair, servicing or maintenance without interrupting the DC load.
Client Requirements
Fertiglobe needed to introduce redundancy while retaining its operational Magellan Power charger.
Without a second charger, failure of the ageing unit could have disrupted the DC supply supporting the site’s HV protection systems, potentially leading to a loss of power across the facility.
With plant continuity a priority over the next 10 years, Fertiglobe required a configuration that reduced its reliance on a single charger and provided greater flexibility for maintenance.
The Solution
Having relied on its existing Magellan Power charger for 19 years, Fertiglobe approached Magellan Power to supply and commission a second unit.
Magellan Power supplied a new CORD4496-A1 110MCRII050 battery charger and integrated it in parallel with the existing SO26539A – 110MCRII050 unit.
The existing load and battery wiring were transferred to the new charger, and new wiring was provided to the original unit. The chargers were interconnected with a breaker and MCB protection, enabling both to supply the same DC load.
The original charger was also cleaned and calibrated as part of the work.
Following consultation with Fertiglobe to understand site requirements, restrictions and local rules, Magellan Power mobilised a technician from its Brisbane team with the tools and spares required to complete installation and commissioning.
Results
The completed installation provides charger redundancy and allows either unit to be isolated for repair, servicing or maintenance without interrupting the DC load.
By integrating a new charger alongside the existing operational unit, Magellan Power improved the system’s resilience and maintainability while retaining equipment that had already delivered 19 years of service.
The project demonstrates a practical approach to upgrading ageing DC power infrastructure at sites where shutdowns are difficult to accommodate.